Surface
22.500 m²
Client
Architect
Period of realization
2020 - 2021
Location
Braine-L'Alleud (BE)

The contract includes the earthworks and the structural work of two buildings, namely a manufacturing facility on five levels and a logistics hall. This project is carried out in partnership with Galère within a very short 45-week time frame.