Bridge

Rebuilding of a bridge above the railway

Image
pont luttre
Image
pont luttre
Image
pont luttre
Period of realization
2006
Location
Luttre - Gosselies (BE)

As part of a consortium, CIT Blaton rebuilt Léonard Bridge, in Luttre not far from Gosselies. This project required the demolition of the old structure and its foundations. This was replaced by a bowstring bridge with metal cables and inclined arches, the hangers of which are crossed. This system allowed the consolidation of the bridge while giving it a modern and pleasant design. Each of the two arches spans a length of 28 m rising up to 7 m, for a feather weight of 40 tonnes.