Cardo Brussels (Sheraton)
In-depth renovation of a hotel
The former Sheraton on Place Rogier closed its doors in 2016 and is now the Cardo Hotels Autograph Collection hotel.
The renovation includes demolition, structural work, finishing work, special techniques, etc.
The main floors affected by the major works are on the ground floor (-1 to +3) and top floor (+29 to +32) of the tower. A very small tower crane is being installed on the roof to make it easier to move loads.
The renovation project will be completed by the end of 2024.